twitter facebook instagram pinterest google-plus close hamburger livechat phone-us showrooms outdure-icon outdure-icon-2 video-play play arrow-right arrow-left close phone envelope search angle-right angle-left angle-light-left angle-light-right chat mobile marker phone-o pdf email picture request request pricing upload plans account basket contact design pricing cad share-alt resistant recycled effecient moisture warranty durable exterior premium_turf hardwoods long-arrow-right filterby download search-big faqs warranties manuals specs cad upload-plans technical-advice concept-design quote engineering construction-drawing installation project-management ai-document audio-document excel-document image-document pdf-document powerpoint-document psd-document txt-document video-document word-document zip-document "

 

The #1 impact on our earthquake rebuild you need to know about

With over 30,000 tradesmen required for the Christchurch rebuild, what does this mean to you as an architect, engineer, drafty or builder? Budget blow outs and time delays?

Is the knowledge of a monumental labour shortage influencing how you specify products and systems for your projects in Christchurch?

Our guess is the imbalance of supply and demand will force tradesmen's hourly rates to increase and make it hard to get the skilled tradesmen you need to achieve a quality finish, without further delays in project timelines.So, how can you minimize the impact to you and your clients projects budget, timeframes?

Here's 3 questions to ask yourself:

When selecting products, brands or systems:

1) How much time is required for installation?

2) What products are going to be most time efficient on site?

3) Do the products have to be installed by specific contractors?

4) Can the products be installed by the average builder with a clear installation guide?

But more importantly:

5)- What products and systems can be pre-manufactured off site to a specific time frame, undercover, unaffected by weather delays, then transported to site and assembled very quickly by the average builder?

Let takes outdoor decking as an example, be it for over a waterproof membrane or on bearers and piles over soil. Typically deck construction takes many days and often weeks to complete. Outdure, an innovative New Zealand company has developed a complete decking system that can be pre-manufactured off site, is light enough to be man handled off a truck and assembled on site in a matter of hours/days by your typical builder.

To learn more about how you can avoid the impact of the labour shortage and benefit from cost effective, time saving innovation visit www.outdure.com/qwickbuild.

Previous Posts

  • A One Size Fits All Outdoor Decking Solution!

    The versatility of Outdure’s ranges is illustrated in these diverse project types all featuring Outdure’s QwickBuild aluminium framing system. Also referred to as an ‘exterior flooring system’, QwickBuild it is the only solution available that supports multiple surfaces (decking, tiles, turf) with multiple height capabilities (<100m – 3m+) over multiple substrates (waterproofing, concrete, ground).

  • How a Decking System Can Make Or Break Your Outdoor Living Space

    Having never used Outdure decking system before, Daniel did not realise how great the product was. “It was so perfect for this customer’s project because Outdure’s QwickBuild system can go so low to the ground, I had to have a frame 120mm off the ground to make it flush with their back door.