twitter facebook instagram pinterest google-plus close hamburger livechat phone-us showrooms outdure-icon outdure-icon-2 video-play play arrow-right arrow-left close phone envelope search angle-right angle-left angle-light-left angle-light-right chat mobile marker phone-o pdf email picture request request pricing upload plans account basket contact design pricing cad share-alt resistant recycled effecient moisture warranty durable exterior premium_turf hardwoods long-arrow-right filterby download search-big faqs warranties manuals specs cad upload-plans technical-advice concept-design quote engineering construction-drawing installation project-management ai-document audio-document excel-document image-document pdf-document powerpoint-document psd-document txt-document video-document word-document zip-document "
Popular Searches
37.8136° S, 144.9631° E
Bushwalk Boardwalk
Government / Council

The Project: 
Upgrade work to protect native trees on a public track in the Waitakere Ranges Regional Park. The 2km track surface has been completely refurbished, including the construction of 275m boardwalk.

Project challenges:
The boardwalk design included ramps categorised as D1 access routes that required a high slip co-efficiency to meet council regulations.

The typically damp and shaded boardwalk required durable construction products, and in keeping with the natural environment, the recycled composite decking was chosen for its sustainability properties.

The solution:
Although CasaDeck has a P5 rating, the ramp areas were designed for extra slip resistance, solved by Outdure who custom designed an anti-slip strip which was laid between the boards. The strip innovation is now in production as an accessory in the QwickBuild system and has wider applications.

Project type:

Remedial

Location:

Waitakere Ranges, New Zealand

Project information:
Installed over: Natural ground
Size: 275m2
Architect/Designer: Auckland regional council - Inhouse
Construction: Anthony Clarke Carpentry
Digital Marketing by King Kong